PROCESS
This project aims to install and commission key systems in an industrial environment, including wiring of electrical equipment, installation of safety systems, and piping for process lines.
- Cleaning and securing the area
- Layout of Robots and Toolings
- Installation of fencing or perimeter mesh
- Installation of cable trays, conduit pipes, and ducts on the floor and area
- Installation of FRL
- Assembly and mounting of process piping, water supply, water return, and air
- Installation of panels and electrical equipment
- Wiring of 24V communication and power
- Power connections in PDP 480 and 120 V
- Installation of safety systems
- Light curtains, stack light, roll-up door, ronba, and HMI
- Wiring of control 24V
- Wiring for communication
- Power On